The PDC Processing Cycle
1. Submit the PDC data within 35 days after end of the reference month via SEAP.
2. PDC will load data and a validation report will be generated.
3. PDC will check the report and send report to the facility contact.
4. Facility contact is to complete the validation report prior to or with next data submission.
5. PDC are to amend these validations and load the next months data.